Location: Parque Cibernético de Santo Domingo (PCSD)

 

Beginning date: March 2007

Completion date:

 

Description: Design and construction of an industrial building   “Nap Del Caribe” consist of a building constructed with Tilt-Up System. A Metal deck ceiling gauge 22, with “Siplast” insulation.